Working to several key design brief themes, around 30 designs were presented where we worked with the client to perform a range rationalisation.
Due to the tight time scales using common parts across the range reduced timescales and costs.
All structural components underwent FEA analysis before drawings were sent to the factory and full testing of first off and production parts.
Liaising directly with the client and the factory, modifying designs where required ensured fast lead times and specification were met exactly.